- home
- business
- Piping & Tubing System Package
Piping & Tubing System Package
business
Menu
recent news
Let's talk
A global leader in the design, manufacturing, and supply of LNG/NG piping and tubing systems.
- +82 51 715 1290
- info@talent-tl.com
Piping & Tubing System Package
VAPORIZER & G/W SKID
BUNKERING STATION
EGR WTS UNIT
In the EGR system, the discharged wastewater is purified through a centrifuge and filter, and the contamination level of the water is measured to meet environmental regulations before being discharged overboard.
BUFFER TANK WITH SUPPLY UNIT
A tank is used to store excess water from the EGR system, where a neutralizing agent (NaOH) is added to regulate the pH of the acidified water. This process controls both the quantity and quality of the water used in the EGR system.
WTS PUMP UNIT
A device that sends the water stored in the buffer tank to the EGR WTS unit.
Others
High Pressure Valve
Material | Stainless Steel 304 & 316L |
Type | Ball valve / Check valve / Needle valve and Shuttle valve |
We provide proper working pressure, temperature and size as customers’ needs and applications. |
High Pressure Hose
Working Pressure | 40~630Bar(g) |
Nominal size of House | 1/4” ~ 4” |
We provide different materials, pressure levels, and connection forms of high pressure hose. |
Pipe in Stock or Order Based
Stainless Steel | 904L, S31254(6Mo), 317L, 316(+2.5%Mo), 304L |
Duplex | S32750, S31803(S32205) |
Nickel Alloys | 20, 200, 400, 600, 625, 825, C276 |
Copper Alloys | CuNi70/30, CuNi90/10, Brass, Bronze, Al-Br |
Fitting
Stainless Steel | 316L(+2.5%Mo), 304L |
Duplex | S32750, S31803(S32205) |
Copper Alloys | CuNi70/30, CuNi90/10, Brass, Bronze, Al-Br |
We provide different types as for customers’ needs and applications. |
- Modularization
- Commissioning
- Project Consultation
- Material Selection
0
Projects Completed
- Welding and Assembly
- Non-Destructive Testing
- Coating and Insulation
- Advanced Manufacturing
0
%