Project Objective:
To safely and efficiently install a 2.0-ton Liquefied Petroleum Gas (LPG) storage tank in accordance with all applicable local, state, and federal regulations. The installation will ensure the secure and reliable storage of LPG.
Project Scope:
- Site preparation and excavation for tank placement.
- Tank delivery and unloading.
- Installation of the LPG tank and associated components (e.g., valves, piping, overfill prevention devices).
- Connection to existing LPG supply system (if applicable).
- Electrical and grounding requirements.
- Pressure testing and leak detection.
- Compliance verification and documentation.
- Post-installation safety briefing and training.
Project Deliverables:
- Properly installed and operational 2.0-ton LPG storage tank.
- Complete project documentation including permits, inspections, and test results.
- Compliance with all regulatory requirements.
- Customer satisfaction with the completed installation.